Flooring:
Raised floor in data Center - 18" clearance
100/250 lbs per
foot live load
Power:
Over 50 Megawatts to Sabey Campus; 3,000 amp @480v 3 phase of IT load
to facility
10,000 amp Emerson DC plant; 8 hours of battery
2N AC UPS design available; 110v AC, 208v AC and
208v 3 phase UPS circuits available
Supports 200 watts per foot
2,000 kW Caterpillar generator
7,500
gallon diesel tank at facility
Emergency Stand-by contracts with local fuel providers
Generator(s) service
is Load bank tested every month
Connectivity:
Multiple Fiber carriers in building; Qwest, Abovenet,
XO, Packet Exchange, ELI, Time Warner, Level 3 and Savvis
Redundant diverse fiber connectivity back to the Westin building
available ; 10 Gig, 2.5 Gig, Ethernet and IP
Direct connectivity to the SIX ( Seattle Internet Exchange)
Carrier
neutral facility
Ethernet handoff; 10, 100 or 1000 Base-T
10 Gig network ports
Security:
HID Access
Secure Building
Key card access 24/7
Entry and exit logs
Surveillance
Closed
circuit monitoring with CCTV
Monitoring via IP connection to remote NOC
Security guards on campus 24/7
Facility:
24/7 on site staff
Additional remote monitoring from Los Angeles Operation Center.
Alarms
tied into Campus monitoring, local Police and Fire departments
Ability to scale and accommodate specific user needs
Air sampling and smoke detection system
Smoke alarms and sensors under floor panels and mounted in ceiling
FM 200 fire suppression system
Multiple zone Pre-action fire suppression
Third party fire monitoring company,
24/7